| Model NO. | ZD-HRH |
|---|---|
| Product Name | H Beam |
| Payment Term | 30%T/T Advance + 70% Balance |
| Alloy Or Not | Low Alloy |
| MOQ | 3tons |
| Model NO. | Q235/Q345/Ss400/St372/St52/Q420/Q460/S235jr/S275jr |
|---|---|
| Edge | Slit Edge |
| Stock | Stock |
| Material | Carbon Steel Series |
| Thickness | 1mm-30mm |
| Model NO. | ZD-HRC |
|---|---|
| Application | Ship Plate, Boiler Plate, Container Plate |
| Edge | Mill Edge, Slit Edge |
| Stock | Stock |
| Material | C10/C45e4/1008/1020/1016/1572 |
| Hrb | Full Hard |
|---|---|
| Sample | Available |
| Business Type | Manufacturer |
| Tolerance | ±1% |
| Item No | B879 |
| Model NO. | ZD-HRSU |
|---|---|
| Material | S240gp/S270gp/S330gp/S355gp/S390gp/S460ap |
| Custom Made | Yes |
| Custom Cycle | 7-15 Days |
| Production Standards | ASTM/JIS/AISI/DIN/BS/En/GB |
| Model NO. | ZD-HRC 25T1250 |
|---|---|
| Application | Construction, Machine,Petroleum, Metallurgy, Ship |
| Edge | Slit Edge |
| Stock | Stock |
| Material | A36 /S235 /S275jr /S355jr DC01//Ss400/SA283 Etc... |
| Model No | SA210 ASTM A213 T12 |
|---|---|
| Sample | Available |
| Hrb | Full Hard |
| Item No | B879 |
| Grade | Q195, Q235, Q345, SS400, SPCC, SPHC |
| Model NO. | ZD-HRC |
|---|---|
| Application | Ship Plate, Boiler Plate, Container Plate |
| Edge | Mill Edge, Slit Edge |
| Stock | Stock |
| Material | C10/C45e4/1008/1020/1016/1572 |
| Model NO. | Q235B Welded Pipes |
|---|---|
| Usage | Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose |
| Section Shape | Round&Square |
| Custom Made | Yes |
| Custom Cycle | 7-15 Days |
| Model NO. | 45# Welded Pipes |
|---|---|
| Usage | Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose |
| Section Shape | Round&Square |
| Custom Made | Yes |
| Custom Cycle | 7-15 Days |